S05 · Project Execution & Supplier Control

One live order. Evidence before shipment release.

UI fixes the order baseline, verifies supplier evidence and coordinates the technical, quality and schedule decisions required before shipment release.

Selected contextT02 · Electrical Machines & Power

Timing
Project-specific · minimum 3 months where recurring project control is required
Commercial basis
Fixed/milestone scope or €3,000–€10,000 / month per active project + approved specialist and travel costs
Engagement model
Milestone project or retained project-control capacity attached to a live PO
Scope at a glance
Begin with
An issued PO or supplier quotation, specification, schedule, inspection points, destination and required acceptance date.
Finish with
A traceable control file, verified progress, closed deviations and a documented recommendation to release, conditionally release or hold shipment.

Buying context

Is the supplier objectively ready for the next hold point, release or delivery commitment?

A purchase order is live and progress, vendor documents, inspection points, changes or release can affect delivery and acceptance.

View buying context
Decision owners
Supplier Quality Engineer / Quality Manager · Project Manager · Engineering / Technical Authority · Procurement / Buyer
Evidence for approval
Baseline, document and inspection status, verified progress, issue / NCR log and release recommendation.
Terms already in the requirement
PO baseline · vendor document schedule · ITP · FAT · NCR · expediting · MDR

What the assignment changes

Progress is credible only when the order file proves it.

01

Baseline before expediting

Scope, dates, submittals, ITP points, responsibilities and acceptance are aligned before status reporting starts.

02

Evidence before percentage

Documents, photographs, records, inspections and open points support progress instead of unsupported supplier claims.

03

Shipment release is a decision gate

NCRs, deviations, concessions, packing, documents and logistics interfaces are reviewed before any release recommendation.

Four controlled decisions

From a live order to a documented shipment-release recommendation.

Each stage turns supplier activity into evidence that engineering, quality, procurement and the project owner can use.

01 · Baseline

Build the control file.

We reconcile PO, specification, supplier offer, approved deviations, schedule, document list, ITP and communication route.

Q01
02 · Monitor

Verify production progress.

Milestones, material status, manufacturing operations, sub-suppliers and document returns are checked against dated evidence.

Q02
03 · Verify

Control inspection and deviations.

Witness and hold points, FAT readiness, NCRs, concessions and corrective actions are coordinated against acceptance requirements.

Q03
04 · Shipment release

Document the release or hold recommendation.

Final documents, open points, packing, preservation and logistics interfaces are reviewed before the shipment-release recommendation.

Q03

Match control to the live order

Baseline. Control. Recommend.

Order setup, recurring supplier control and the final inspection/FAT and shipment-release recommendation are scoped separately around the evidence and risk already present.

Q01

Order-control baseline

What this engagement buys

A reconciled PO file, document and inspection schedule, responsibility matrix, open-point register and evidence-based reporting format.

Commercial basisFixed fee after contract-file review
Build the control baseline
Q02

Active supplier control

What this engagement buys

Recurring evidence checks across schedule, submittals, manufacture, changes, NCRs, recovery actions, forecast shipment-release date and readiness.

Commercial basis€3,000–€10,000 / month per active project + approved costs
Control the live order
Q03

Inspection, FAT & shipment-release recommendation

What this engagement buys

Readiness review, qualified inspection coordination, evidence file, open-point position and a documented recommendation to release, conditionally release or hold shipment.

Commercial basisEvent fee + approved specialist and travel costs
Prepare the shipment-release recommendation

Minimum useful evidence

Send the contract file already controlling the order.

A perfect dossier is not required. The first review separates missing evidence from actual supplier performance risk.

01

Contract basis

What to include

PO, supplier quotation, specification, approved deviations, Incoterm and payment milestones.

02

Technical basis

What to include

Drawings, datasheets, document requirements, interfaces, applicable codes and acceptance criteria.

03

Control basis

What to include

Schedule, document register, ITP/QCP, FAT procedure, inspection points and reporting rhythm.

04

Delivery basis

What to include

Destination, required-on-site date, packing, preservation, Incoterm and the owners of freight, customs, unloading and site acceptance.

Execution boundary

UI controls the route; it does not replace the manufacturer or client approvals.

The assignment names who owns design, manufacture, inspection, concession approval, the shipment-release decision and final acceptance.

01

Supplier progress is not reported as verified without dated evidence.

02

Inspection does not transfer manufacturing responsibility from the supplier.

03

UI does not approve regulated design changes or concessions on the client’s behalf.

04

Freight, customs, installation, commissioning and site acceptance continue through S06 and are included only when separately contracted.

Start with what exists

Put the live supplier order under control.

Send the PO, supplier file, current schedule and the issue now threatening shipment release. The assistant preserves the S05 context and identifies the first evidence gap.

Control the supplier order Email the supplier-order file